Alhumaidi, H M (2015) Construction Contractors Ranking Method Using Multiple Decision-Makers and Multiattribute Fuzzy Weighted Average. Journal of Construction Engineering and Management, 141(04).

Barry, W, Leite, F and O’Brien, W J (2015) Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites. Journal of Construction Engineering and Management, 141(04).

Birgonul, M T, Dikmen, I and Bektas, S (2015) Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices. Journal of Construction Engineering and Management, 141(04).

  • Type: Journal Article
  • Keywords: Construction delay; Delay analysis; Extension of time; Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000946
  • Abstract:
    Many factors, such as unforeseeable events, managerial and financial problems of contractors, insufficient technical capacity of site teams of contractors or Consultants, and so on, may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is of prime importance. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record-keeping mechanism at the site, communication among project participants, delay analyst, and delay analysis methodology. The main purposes of this study are to identify the shortcomings frequently encountered in the implementation of delay analysis applications in all stages of a construction project, to address the responsible element, and to propose a set of rules to overcome these shortcomings and obtain accurate and reliable results. For this purpose, 17 shortcomings were identified. Moreover, an integrated approach is developed which is composed of a set of rules solving all of the identified shortcomings, and a flowchart guiding the parties from scratch until the end of the project. This study is unique in its nature as it encompasses all stages of a construction project that contribute to a delay analysis application.

Cao, M, Cheng, M and Wu, Y (2015) Hybrid Computational Model for Forecasting Taiwan Construction Cost Index. Journal of Construction Engineering and Management, 141(04).

Dharmapalan, V, Gambatese, J A, Fradella, J and Moghaddam Vahed, A (2015) Quantification and Assessment of Safety Risk in the Design of Multistory Buildings. Journal of Construction Engineering and Management, 141(04).

Liu, J, Love, P E D, Sing, M C P, Carey, B and Matthews, J (2015) Modeling Australia’s Construction Workforce Demand: Empirical Study with a Global Economic Perspective. Journal of Construction Engineering and Management, 141(04).

Vogl, B and Abdel-Wahab, M (2015) Measuring the Construction Industry’s Productivity Performance: Critique of International Productivity Comparisons at Industry Level. Journal of Construction Engineering and Management, 141(04).

Wanberg, J, Javernick-Will, A, Chinowsky, P and Taylor, J E (2015) Spanning Cultural and Geographic Barriers with Knowledge Pipelines in Multinational Communities of Practice. Journal of Construction Engineering and Management, 141(04).

Wauters, M and Vanhoucke, M (2015) Study of the Stability of Earned Value Management Forecasting. Journal of Construction Engineering and Management, 141(04).